Satya Nora

Satya Group is propelling another new Project “NORA” at the Hermitage, Sector 103 Gurgaon. Lavish, 1 BHK Air adapted Studio flats with high specs.pay just 30% in 4 months and Remaining 70% on offer of Possession.

 

image_2

 

Specifications :-

STRUCTURE
RCC Framed Earthquake Resistant Structure

BED/ SITTING
Floor Vitrified Tiles DOORS
Walls Oil Bound Distemper (OBD)
Ceiling Oil Bound Distemper (OBD)

KITCHEN
Floor Anti-skid Ceramic Tiles
Walls Tiles upto 2′-0″ above counter & Tiles
upto 5″-0″ on rest of exposed walls & Oil
Bound Distemper in the balance area
Ceiling Oil Bound Distemper (OBD)
Counter Granite
Fitting / Fixtures CP Fittings,Single Bowl SS Sink, Modular
Kitchen below Counter

TOILET
Floor Anti-skid Ceramic Tiles
Wall Combination of Ceramic Tiles & Oil
Bound Distemper (OBD)
Ceiling Oil Bound Distemper (OBD)
Counters Marble / Granite
Sanitary Ware Single Lever CP Fittings, White
Chinaware
BALCONY
Floor Anti-skid Ceramic Tiles
Railing MS Painted Railing

DOORS
Door Frames Hard Wood Frame
Internal & External Door Laminated Flush Doors
External Doors/ Anodised Aluminium /UPVC glazed
Windows / Ventilations Doors & Windows

ELECTRICALS
Modular Switches,Copper Wiring in concealed conduit with light &
power points,TV, and telephone sockets in the room

ENTRANCE & LIFT LOBBY
Floor Combination of One or more of Vitrified
Walls Tiles / Marble / Granite
Granite and Textures Paint
STAIRCASE
Floor Combination of One or more Indian
Marbles / Granite
POWER BACK-UP
Apartment Type Power Back-up
1 BHK 3 KVA

 

Floor Plan :-

nora-layout

 

Price List :-

1 BHK – 558 sq ft

BSP : 6999/Sq. Ft.

Inaugural Discounts: INR 140 /Sq. Ft.

Effective BSP: 6859/ Sq. Ft.

Booking Amount 2 Lacs Only/-

Limited Units..Book At First Rate

Payment Plan :-

Construction Linked Payment Plan

On Booking : Rs 2 Lacs
Within 30 Days of Booking : To Complete 10% of BSP Including amount paid on booking
Within 75 Days of Booking : 10% of BSP
Within 150 days of Booking : 7.5% of BSP
On Commencement of Basement Roof Slab : 7.5% of BSP + 50% of EDC & IDC
On Commencement of Ground Floor Slab : 7.5% of BSP + 50% of EDC & IDC
On Commencement of 01st Floor Slab :7.5% of BSP + 50% of PLC
On Commencement of 02nd Floor Slab: 7.5% of BSP + 50% of PLC
On Commencement of 03rd Floor Slab :7.5% of BSP
On Commencement of 04th Floor Slab :10% of BSP
On Commencement of Top Floor Slab :10% of BSP
On Commencement of Flooring work*: 10% of BSP
On Offer of Possession : 5% of BSP + CM +IFMS + Registration Charges + Stamp Duty + Other Charges as applicable

 

 

Locatiom Map :-

map

 

 

For  Site Plan Details Call Our Property Expert @ +91-9999415318